BPCA- Wagner Park Pavilion Package 2, Manhattan
CLIENT
Battery Park City Authority
COMPLETION DATE
On-going
SCOPE OF SERVICES
-
Concrete Sampling & Testing
-
Grout Sampling & Testing
-
Special Inspections
-
Cold Formed Steel
-
Concrete Pretressed
-
Concrete Cast-in-Place
-
Masonry
-
Mechanical Demolition
-
On-Site Storm Water Drainage
-
Pile Inspections
-
Post-Installed Anchors
-
Seismic Percolation Test Drainage
-
Structural Steel – Details
-
Structural Steel – Welding
-
Structural Steel – High Strength Bolting
-
Subgrade
-
Support of Excavation
-
In-Place Density
-
Underpinning
-
Aluminum Welding
-
Welding – Fuel Gas Piping
-
Welding – High Pressure Steam Piping
-

Photo Courtesy of BPCA.NY.GOV
PROJECT DESCRIPTION
The Wagner Park Pavilion Package 2 project is constructing a new Park Pavilion within Wagner Park, adjacent to Battery Place near the southwestern tip of Manhattan. The New Pavilion will replace a prior park pavilion structure of similar size, placement and orientation, which was demolished in 2023. The new pavilion is divided into two distinct wings, with the north wing identified for use as a community space with a lower-level area devoted to BPCA Parks maintenance and storage; and the south wing designed to accommodate a potential restaurant or other food service operation with a kitchen at the lower level. The new pavilion will house public restrooms and a public rooftop viewing area. The new
pavilion will serve as an important element of the newly designed Wagner Park, which will incorporate critical risk reduction measures in defense of coastal storm surge and sea level rise.
PROJECT TYPE